
Highfield Equestrian top quality arenas
The construction process:
- Mark out the site
- Strip top soil from the area
- Excavate site to form a level base
- Lay membrane over base
- Insert perforated drainage pipe
- Erect the fence around the perimeter of the arena all posts are concreted.
- Lay clean stone over entire base and compact to form a solid free draining base.
- Lay membrane over stone
- Lay silica sand and surface




